AV-B Ride Jan 10: Montebello, Redwood Gulch & Hwy 9

📅 Date & Time
Sat, Jan 10, 09:00 AM
📏 Distance
84 km
⛰️ Elevation
1836 m
🔗 Original Posting
Alto Velo Racing Club icon
🌐 Route Map
🌤️ Weather
Ride Description

⚠️The ride is subject to Alto Velo's Ride Rules and all participants must sign an annual waiver.⚠️


Hi AV-Bers,

This Saturday we are tackling a climbing-heavy route with some local favorites. We will head out and warm up before taking on the long climb up Montebello. After regrouping at the top, we’ll descend back down the way we came (watch your speed and stay in your lane!) and head over to Stevens Canyon.

From there, we’ll take on the steep challenge of Redwood Gulch before connecting to Highway 9 for the climb up to Skyline. After a traverse along the ridge, we’ll enjoy the long descent down Page Mill and cruise back to the start.

It’s a big climbing day with over 6,000 feet of elevation, so bring plenty of food and water. We’ll stick to the standard regroups to keep everyone together.

Start / End Location

Summit Bicycles, California Ave

Route

Montebello and the 9

52 miles, 6,025 feet

Summary

↑ Montebello ↓ Montebello → Stevens Canyon ↑ Redwood Gulch ↑ Hwy 9 → Skyline ↓ Page Mill

Start Time

Meet: 9 AM, leave: 9:12 AM

Regroups

  • Top of Montebello

  • Stevens Canyon Picnic Area (Water)

  • Fire Station 21 (Skyline)

  • Top of Page Mill

  • Bottom of Page Mill / Arastradero

Ride Leader

Nicolas Delecroix

Non-members are always welcome, but please complete the waiver once a year.

Please make sure to familiarize yourself with the ride rules as well.

AV-B Ride Jan 10: Montebello, Redwood Gulch & Hwy 9 | SF Bay Area Group Rides