⚠️The ride is subject to Alto Velo's Ride Rules and all participants must sign an annual waiver.⚠️
Hi All,
Reports are that the resurfacing work in the Steven’s Canyon, RWG, Montebello area is done so this week not only do you get a free drink at Shake Shack but you get two ride options for the price of one! Terms and conditions apply.
We will roll out as one big happy family and stay that way or I will turn this group ride around… which we will, at the very end of Steven’s Canyon road, after a water and bathroom stop at the Canyon picnic area at mile 14. If you brought your road bike, turn to page “Road Ride.” If you want to do some dirt/gravel, turn to page “Dirt Ride.”
AV C Road Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles
Road Route: Steven’s Canyon, RWG, 9, Page, Shake Shack; 46 mi, 4200ft
Regroups:
Canyon Picnic Area (bathrooms, water)
Hwy 9 Fire Station (water)
Top Page Mill (bathrooms)
Bottom of Page Mill at Arastradero
Shake Shack
Ride Leader : Eric
AV C Dirt Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles
Gravel Route: Steven’s Canyon, Montebello Gravel, Page, Dero Dirt, Shake Shack; 46 mi, 4500ft
Regroups:
Canyon Picnic Area (bathrooms, water)
Top of Montebello Road at gate
Black Mtn Campground (bathrooms)
Montebello Parking lot (bathrooms) @ Page Mill & Water stop on Page
Paseo Del Roble & Page
Shake Shack
Ride Leader : Jonathan
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.